Fire alarm & detection
Addressable detection and call points, voice evacuation, the cause-and-effect matrix, battery and cable calculations.
CodesNFPA 72, SBC 801
Fire & life safety consultancy, Riyadh
Plintora prepares fire strategies, FLS drawings and third-party design reviews for developers, consultants and contractors across Saudi Arabia. One team carries the scope from the first code check to the Civil Defence certificate.
From the first code check to the Civil Defence certificate, one team carries the fire and life safety scope from start to finish.
Interpretation of SBC and NFPA requirements from concept stage, so the design starts on the right path and the architect knows the fire limits before layouts are fixed.
DetailsFire strategy reports and complete FLS drawing packages for egress, compartmentation and every fire protection system, with the calculations behind them.
DetailsIndependent review of other consultants' FLS and fire MEP designs, a graded comment register, and stamping once the design complies.
DetailsCivil Defence (Salamah) and Balady submissions, comment responses and close-out, handled by the same engineers who prepared the design.
DetailsFire compliance technical reports on the Salamah platform for Balady licence renewals, from the site visit to the issued report.
DetailsShop drawing review, inspection, testing and commissioning support, and the as-built review at handover.
DetailsEvery system a building needs, for every occupancy type, with the calculations and schedules that Civil Defence expects to see.

Addressable detection and call points, voice evacuation, the cause-and-effect matrix, battery and cable calculations.
CodesNFPA 72, SBC 801

Wet, dry and pre-action sprinklers, standpipes and hose cabinets, hydrants, fire pumps and tanks, with full hydraulic calculations.
CodesNFPA 13, 14, 20, 22, 24

Clean agent for server and IT rooms, foam systems, kitchen hood suppression and special hazard risk review.
CodesNFPA 2001, 11, 17A, 96

Occupant loads, exit capacity and travel distance, exit signage, emergency lighting and door hardware schedules.
CodesSBC 201, NFPA 101, 110

Car park smoke clearance, atrium and mall smoke exhaust, stair and lift pressurisation, CFD and tenability where required.
CodesNFPA 92, SBC 501

Fire-rated walls and floors, fire doors and opening protection, compartmentation, firestopping and door schedules.
CodesSBC 201, NFPA 80
Five stages, each with a clear deliverable and an internal review before the next one starts. It keeps the design moving and avoids surprises at Civil Defence.
Kick-off meeting, information request and a project risk register.
Code analysis, occupancy classification, occupant loads and the FLS strategy report.
Coordinated FLS drawings, hydraulic and battery calculations, and specifications.
Civil Defence package, comment log and responses through to approval.
Shop drawing review, testing and commissioning, and the as-built package.
Design packages, third-party reviews, compliance reports and fire strategy studies for towers, compounds, offices and industrial sites. See all projects
| Project | Type | Client | Our scope |
|---|---|---|---|
| SAP Riyadh Office | Corporate office fit-out | SAP International | FLS design and third-party review |
| ESRI Riyadh Office | Corporate office fit-out | M Moser Associates | FLS design input and third-party review |
| Majal Storage Facilities | Industrial storage and manufacturing | Majal | FLS shop drawings |
| Golden Vehicle Car Rental | Retail, mercantile occupancy | Golden Vehicle Car Rental Co. | SBC 801 compliance report |
| Alia Complex | Mixed-use development | Abdulelah Al Mohanna Engineering Consultant Office | Fire strategy study |
| TAJ Commercial Centre | Mall, hotel and offices | AD Engineering Consultancy | Fire strategy study |
Before Plintora, our engineers designed fire protection for some of the region's largest hospitals, hotels and infrastructure.






Many commercial licences can only be renewed once a licensed consultant confirms on Salamah that the premises meet the fire code. We visit, list what needs fixing, and issue the technical report once the premises comply.
If your question is not here, call or message us. An engineer will answer.
A full design means we produce the fire strategy, drawings and calculations ourselves. A design review means another consultant has prepared the design and we check it against SBC and NFPA, issue a graded comment register, and stamp the drawings once they comply.
The Saudi Building Code 2024 editions (SBC 201, 501, 801 and 901) and the NFPA standards they reference, using the editions Civil Defence has adopted at the time of submission. The full list is on our codes page.
Yes. We prepare the submission package, upload it on Salamah, track the comments and respond until the approval is issued. The engineers who did the design are the ones who answer the comments.
Yes. We issue Salamah technical reports for Balady licence renewals. See how the report works and what we need from you.
The architectural drawings (PDF or DWG), the building use and area, the location, and the stage of the project. If drawings are not ready yet, a short description is enough to start the conversation.
Send us the architectural drawings and a short description. We will come back with the scope, the programme and a fee.